Site appraisal for construction
Very early appraisals of potential sites for a development may be carried out by a surveyor, before the appointment of the consultant team, during the business justification stage. Appraisal of alternative sites may also be an important part of an environmental impact assessment.
Subsequent site appraisals by the consultant team will obtain details that might not have been available in the site Information provided by the client. They are also an opportunity for the consultant team to familiarise themselves with the site and assess the detailed surveys that might be necessary.
Specific appraisals that might be made by individual consultants include:
- Architect:
- Desktop study of site history.
- Study of site context including access, boundaries, levels, landscape (including possible ecological issues such as the presence of japanese knotweed), transport and traffic and an assessment of neighbouring properties and views.
- Appraisal of possible hazardous substances such as asbestos and other deleterious materials.
- Photographic studies.
- Assessment of the local planning authority's local development plan.
- Climatic conditions.
- Cost consultant:
- Structural engineer:
- Desktop study of geological issues or contaminated land.
- Cursory study of neighbouring or existing structures that might require demolition or might otherwise be impacted by development.
- Desktop study of foundation solutions adopted by adjacent developments.
- Services engineer:
- Location and nature of underground site services.
- Cursory investigation to establish 'cut off' for diversions of existing services.
- Statutory utility drawings for the site.
[edit] Related articles on Designing Buildings
- Alternative site assessment ASA.
- Building People.
- Building survey.
- Conceptual site model.
- Condition.
- Condition survey.
- Contaminated land.
- Demolition.
- Desk study.
- Development appraisal.
- Difference between existing use value and market value.
- Environmental Impact Assessment.
- Feasibility studies.
- Gross development value.
- Ground conditions.
- Insitu testing of soils.
- Laser scanning.
- Property valuation.
- Radon.
- Radon protection for new domestic extensions and conservatories with solid concrete ground floors (GG 73 revised).
- Site information.
- Site investigation.
- Site selection and acquisition.
- Site surveys.
- Soil survey.
- Surveyor.
- Technical due diligence.
- Vendor survey.
Featured articles and news
Listed despite problems with its design.
Zen and the art of cycling exploration.
Design Council Homes Taskforce launched
To support government 1.5 million homes target within UK climate commitments.
The story of this knowledge quarter building.
In ecology, in hydrology, in biology and in architecture.
Creating environments that promote physical, mental, and social well-being.
UK cases of neutral current diversion
Research project looks for example contributions.
Overstocking and macro-economics cause a decline.
The 2024 update of the Common Assessment Standard
Demonstrating organisational capability’ to fulfil roles under the Building Safety Act.
56 recommendations for a better built environment
Published by the CIC ahead of the King’s Speech.
SkillELECTRIC Top 8 Competitors Named
in annual search for the UK’s best student electrician.
CIOB Diversity and Inclusion technical information sheet
Step-by-step guide on implementing D and I practices.
Conservation and the Indian City. Book review.
Reversibility in conservation ethics
Learning from painting conservation.
Where It's AT Podcast launched!
New CIAT Architectural Technology Podcast goes live.
Comments